108A West Street Queenton QLD 4820
For Sale Offers over $730,000
- Property Type House
- Land area approx 607sqm
- Floor area approx 210sqm
- Region Townsville and North West
- Locality Charters Towers
- Garages 2
Fresh Update with a Brand-New Roof Worry-Free Living
Phone enquiries - please quote property ID 38111.
Welcome to 108A Francis St – a beautifully presented home that blends comfort, functionality and effortless style. Set on a 607m2 block just footsteps from the base of Castle Hill in West End this home offers a combination of space, practicality and position.
Inside the house, you will be impressed with the beautifully polished floorboards and freshly updated features, while boasting natural light and cool breezes. The heart of the home is the kitchen, which offers expansive bench space, abundant storage and a brand-new dishwasher. The kitchen overlooks the open-plan dining and living area making it perfect for both everyday living and entertaining offering a sleek, yet practical hub for the home.
The home features;
• A BRAND-NEW ROOF just in time for Townsville’s wet season, all documentation is available upon request.
• Four generous bedrooms, the master with an ensuite and a walk-in shower.
• Stunning family bathroom with floor to ceiling tiles, and a separate shower and bath.
• All four bedrooms have air conditioning, fans and a built-in wardrobe with shelving.
• A double driveway, main driveway leads to lock up garage under the house. The second driveway leads to the side of the house providing extra parking for a trailer, boat and/or caravan, all of which can be secured behind the double gates.
• A fully fenced yard and a 6m X 3m shed at the rear of the property, which is ideal for a workshop or extra storage.
• Underneath the home is lockable with an extra toilet for when relaxing and entertaining downstairs.
• The majority of the home underneath is legal height which offers endless opportunities ie create another suitable residence for investment purposes or as a separate dwelling for the grandparents. Or simply use the extra space for your growing family to enjoy and entertain the extended family.
This home is stylish, spotless and ready to move straight into, offering a combination of space, practicality and position.
DISCLAIMER While proudly assisting home owners to sell since 1999, No Agent Property takes every care to verify the accuracy of the details in this advertisement, but the correctness cannot be guaranteed.
Property Features
- Air Conditioning
- Deck
- Dishwasher
- Fully Fenced
- Outdoor Entertaining Area
- Pet friendly
- Polished timber floors
- Remote Controlled Garage Door
- Secure Parking
- Shed
Email a friend
You must be logged in and have a verified email address to use this feature.
Call Agent
-
No Agent Property - QLDNo Agent Property