10 Mountain Road Laidley QLD 4341
For Sale Offers Over $765,000
Under Offer- Property Type House
- Land area approx 6856sqm
- Region Ipswich and West Moreton
- Locality Lockyer Valley
- Carports 1
- Toilets 2
- Uncovered Carspaces 2
Breathtaking Views with Character & Charm
Relocated to capture what would have to be some of the best views in the Laidley area, this unique two-storey timber home offers character, space, and an outlook that will take your breath away. Set on a generous 6,856sqm block, this charming residence looks west across the Lockyer Valley, with views stretching towards Toowoomba.
Originally built as an upstairs timber home, the lower level has been enclosed in later years, creating a huge lounge and dining area featuring a beautiful fireplace and split system air conditioning. French doors open onto the deck, where you can sit back, relax, and enjoy the ever-changing views across the valley.
Full of character, the home features unique timber windows, polished timber floors, and a wall of shelving creating the perfect study nook or reading space. The compact yet functional kitchen includes a dishwasher, electric cooktop and oven, along with a large pantry that could easily be transformed into a fantastic butler's pantry. A separate powder room tucked behind a beautifully crafted timber door adds another special touch.
The beautiful timber staircase repurposed from an old church leads to the upper level, where you'll find a versatile open space, perfect as a second living area, children's retreat, or home office. Beautifully maintained timber floors continue throughout this level, which offers two generous bedrooms plus a third smaller bedroom.
The master bedroom features air conditioning, a walk-in robe, and private balcony access through French doors - creating the perfect place to enjoy your morning coffee while soaking up the incredible valley views. The third bedroom also opens onto its own verandah, providing another peaceful spot to unwind. Upstairs is serviced by a practical bathroom with shower, separate toilet, and a separate laundry room.
Outside, the property offers plenty of space and functionality with a large 9m x 11m shed, carport, large rainwater tank, and a fenced house yard that's ideal for children and pets.
While parts of the home would benefit from some updating, the character, solid bones, and spectacular outlook provide an exciting opportunity to add your own style and create something truly special.
Perfectly balancing peaceful country living with everyday convenience, the school bus passes directly by the front of the property, making family life that little bit easier. You're also just 15 minutes from Plainland and the Warrego Highway, giving you quick access to shopping, schools, and an easy commute to Ipswich or Brisbane.
With uninterrupted views over the Laidley township and across the Lockyer Valley towards Toowoomba, this is a property where you'll find yourself spending hours on the deck, watching the changing colours of the landscape and embracing the tranquillity that only a property like this can offer.
This property is not to be missed!
Disclaimer: While every effort has been made to ensure the accuracy of the information in this property overview, it has not been independently verified. Neither the vendor nor the agent makes any warranty as to its accuracy. Prospective purchasers are advised to conduct their own enquiries and rely on their own judgment.
Property Features
- Built In Wardrobes
- Deck
- Dishwasher
- Floorboards
- Grey Water System
- Shed
- Water Tank
Email a friend
You must be logged in and have a verified email address to use this feature.
Call Agent
-
Angela NorthElders Real Estate Laidley

